CASES · PRACTICE WITH EVIDENCE

Every case states its true maturity

Each case is presented by delivery status, public boundaries and verifiable evidence: live projects show operating results, while joint validation and target models make the next step clear.

CREDIBILITY RULE

Facts, authorization, and evidence must align

Public cases should have verifiable results and client authorization; planned cases may show direction but must be clearly labeled.

MATURITY MAP

From verified capability to an industrial model set

Each case is labeled by delivery status, public boundaries and verifiable evidence; live projects are presented separately from solution directions.

01

Central SOE smart-manufacturing line control

Delivered · Running

Delivered and running. As the communication hub of a discrete-manufacturing line, it connects upward to MES and downward to PLCs, automation equipment, and HarmonyOS terminals, covering 10 business domains and 137+ function points.

  • Full Xinchuang stack
  • Class-2 MLPS
  • HarmonyOS adaptation
  • Offline cache ≥4h
137+
Function points · 10 business domains
≤20ms
Central control latency
≥4h
Offline cache
≤60s
Recovery target
02

A large manufacturing plant central control platform (client-desensitized)

Live · Stable

The project is live and running stably, with ongoing optimization based on operating feedback. Its design line covers central control, equipment connection, data governance and reserved future AI scenarios; similar lines take about 1 month to replicate.

  • Central control platform
  • Equipment access
  • Production status
  • Security linkage reserved
03

An electrical-equipment enterprise upper-layer system model (joint validation stage)

Joint validation

Based on the workshop's completed PLC retrofit, we plan a model for central control, lightweight MES, quality traceability, and equipment management. Before public release, authorization and delivery-fact verification with the enterprise must be completed.

  • PLC data utilization
  • Central control planning
  • MES roadmap
  • Quality traceability roadmap
04

Hydropower critical-parts manufacturing model

Target model (direction)

We build a target scenario around process quality, critical equipment, material traceability, and safe production for large hydropower equipment parts. It is currently only a product roadmap, not promoted as a delivered case.

  • Critical quality points
  • Equipment status
  • End-to-end traceability
  • Safe production

PUBLICATION GATE

Four checks before a case goes live

These standards protect client relationships and the company's long-term brand credibility.

Fact status

Delivered, in implementation, or still planned

Client authorization

Can the name, logo, images, and data be made public

Evidence materials

Are the interface, acceptance, metrics, and field assets verifiable

Confidentiality boundary

Are process, equipment, network, and security details desensitized

Your site can be the next case

Bring a site description or equipment list to talk, and we will provide an initial plan with parameter boundaries.

U
umod®
FACTORY FLOORS, VISIBLE AND UNDER CONTROL

UmodAI (Wuhan) Intelligent Technology Co., Ltd.: the line-control system serves as the communication hub of industrial sites — connecting equipment, people and business systems, with five core duties: command dispatch, data upload, store-and-forward caching, alarm closed loop, and security audit.

Contact

Room 275, Building 3, No. 37 Jiefang Avenue, Qiaokou District, Wuhan, Hubei, China
186-0272-6852 (WeChat same number)
zhuxu@UmodAI.com
Wuhan · Delivering nationwide

© 2026 乌梅藕带(武汉)智能科技有限公司

鄂ICP备2025149228号-4